No200 Century Avenue Shanghai China
Home ProductsDrinking Water Production Line

Complete Drinking Water Production Line Mineral Water Bottle Filling Machine

Complete Drinking Water Production Line Mineral Water Bottle Filling Machine

    • Complete Drinking Water Production Line Mineral Water Bottle Filling Machine
    • Complete Drinking Water Production Line Mineral Water Bottle Filling Machine
    • Complete Drinking Water Production Line Mineral Water Bottle Filling Machine
    • Complete Drinking Water Production Line Mineral Water Bottle Filling Machine
  • Complete Drinking Water Production Line Mineral Water Bottle Filling Machine

    Product Details:

    Place of Origin: Shanghai China
    Brand Name: Meantech
    Certification: CE,ISO9001,SGS
    Model Number: MT-2004

    Payment & Shipping Terms:

    Minimum Order Quantity: 1 Set
    Price: 2000-100000 USD
    Packaging Details: Stand Export Package
    Delivery Time: 30 Days
    Payment Terms: L/C, D/A, D/P, T/T, Western Union
    Supply Ability: 20 Sets Per Month
    Contact Now
    Detailed Product Description
    Type: Filling Machine Automatic Grade: Automatic
    Driven Type: Electric Voltage: 220V/380V
    Place Of Origin: Shanghai, China (Mainland) Model Number: CGF 32-32-10 Mineral Water Processing Line
    After-sales Service Provided: Engineers Available To Service Machinery Overseas Electrical Brand: Simens,Omron,ect
    Service: Turn-Key Services Warranty: 2 Year

    5000 BPH - 1200 BPH Complete Bottle Mineral Water Processing Filling Production Line

     

     

     

     

    The product description

     

    Production line reliable bottling mineral water treatment filling machineCompact structure, perfect control system and convenient operation. Advanced touch screen and PLC control system make man-machine communication real. Mineral water filling machine

    • The concept of CGF series mineral water production line is specially designed for filling in sanitary environment.
    • Due to the free-standing transfer star wheel, the outer surface of the packing is much less than that of the conventional system.
    • The innovative design also has the goal of making the machine easy to maintain, and it can expand at any time without conversion, for example, with an additional hat feeder.
    • Omron PLC system provides an ideal solution for conducting non-carbonic acid filling products because the filling is accurately measured by induction flowmeter.
    • All filling process steps can be easily and independently programmed to adjust to the products and containers to be filled.
    • For all variations of CF series non-carbonated products, the container is transported by machine through neck processing. This, and through the induction flowmeter (IDM) fill volume determination to ensure high flexibility and short conversion time;
    • Depending on the pitch circle, use a central or tubular ring bowl;
    • The product feed pipe connects the product tank to the filling valve. In each connection pipe, there is an induction flowmeter, which measures the number of products flowing through the pipe by the conductivity of the product.
    • The filling process starts after the container is centered and is realized by free jet method.
     

    Features

     
     

    Washing - mineral water filling machine

     

    It consists of washing pump, bottle holder, water dispenser, upturned plate, guide rail, protective cover, spray device, defrosting dish, rinsing water and rinsing water reflux tank.

     

    Filling part - mineral water filling machine

     

    Filling barrel, filling valve (normal temperature and pressure filling), filling pump, bottle hanging device/bottle holder, lifting device, liquid indicator, pressure gauge, vacuum pump, etc.

     

    Sealing - mineral water filling machine

     

    Cover, cover loader (separated type), cover unloader, cover rail, pressure regulator, cylinder, etc., also need air compressor as auxiliary external equipment.

    Our service
    ,Payment method: 30% is T/T as the down payment, and 70% is delivered before T/T payment. ,Mechanical guarantee:More than one year and at least one year spare parts recommendation ,Delivery time: 30 days after the down payment &am am am execution and am bottle/cap sample ,Upcoming documents: 1. Machine quality assurance 2. Installation and maintenance of English manual 3. Clear customs documents for customers ,On-site installation: 1. Payment in installments of $100 per day. Artificial allowance 2. Provide free training fee for customers during installation 3. Tickets from China to the customer's factory and returns paid by the customer 4. Local housing, food and transfer costs of the customer's factory paid by the customer
     

    Company Details

     
    We specialize in beverage machinery. We provide different independent equipment (such as processing system, water treatment system, blow molding system, filling system, UVT system, secondary packaging system). We have many years of design experience and the number of know-how. Most of the components adopt foreign advanced famous brands, such as mitsubishi, Siemens, omron, schneider, etc. Long term warranty and good service will satisfy you. Regular processing reports will give you a complete picture of the production process.

    5000 BPH - 1200  BPH Complete Bottle Mineral Water Processing Filling Production Line

     

    Contact Details
    Meantech Industrial Co.,Ltd

    Contact Person: Mr. Li

    Tel: +8617372676486

    Send your inquiry directly to us (0 / 3000)

    Other Products